Private-label hiking backpacks, Dry Creek Z backpacks and duffels run on a separate line-card code from stock wholesale. MOQ, sampling cycle, print, embroidery, cut and color maps sit on the proposal, not on a hangtag.
Stock-wholesale and private-label OEM are not the same PO. A stock Simms backpack ships in live colors with the Simms hangtag. An OEM lot freezes torso geometry, denier, PU millimetre rating, decoration map and carton language before the mill books capacity. Mixing both on one form without two codes stops the five-day proposal clock.
Hiking bodies in the 50–70 L band keep the framesheet and hip-belt foam from the engineering map. We will change denier and colorway; we will not restripe a stay to chase a cheaper gram weight without a new sample ticket. Dry Creek Z backpack OEM lots can drop the lid pocket. They cannot drop the welded cell stitch path if the buyer later wants a dry-bag derivative on the same last.
Capacity on the hangtag is a litre number. Capacity on the mill is cut tables, embroidery heads and carton printers. We quote the mill, then we quote the hangtag.
OEM planner note, pack programs
Team and club buyers often ask for jersey-number logic. On packs that becomes an optional number patch or a 50 mm embroidery window, not a sublimated kit. Screen print is cleared on 210D and 420D ripstop after a strike-off. 600D duffel bases take embroidery or woven labels. Sublimation is refused on PU-coated ripstop because the ink sit is not stable. Welded TPU dry bags take heat-transfer marks only after a weld-map review; ink that sits on a weld line is refused.
Private-label hiking backpacks start at 500 pieces per colorway when the denier is already on the mill card. New denier or a new stay map starts at 800 pieces. Dry Creek Z backpacks can open at 400 pieces in a live denier. Duffels open at 300 pieces because the 600D base is a shared mill roll. Welded dry bags open at 400 pieces per colour. A color chip is not a booking; the mill books after the sample ticket is signed.
Fit samples leave in 12–18 working days when artwork is frozen. Strike-offs for screen print leave in 7 working days. Embroidery maps leave in 10. A sample checks stitch path, hip-belt foam, roll-top weld and logo placement. It does not freeze next-season denier unless the lot number is on the ticket. Guide-pack rod-sleeve geometry is a separate sample, not a graded size of the commute daypack.
Decoration methods on the card: screen print, embroidery, woven label, hangtag and carton mark. Cut maps follow the live last; we do not restripe a 60 L panel to mimic a Dry Creek Z 25 L. Colorways need a physical chip or a Pantone on coated stock. Digital hex values are planning aids only. Team number patches are hardware. We do not sublimate coated ripstop.
Standard dossier: ISO 9001:2015 mill and sewing-site certificates, OEKO-TEX STANDARD 100 class II for textile lots, amfori BSCI for the sewing site, and bluesign mill notes when the fabric mill provides them. North America kids-adjacent lots add CPSIA tracking labels. EU lots can add REACH statements. Pack bodies are not PPE; we do not attach EN 1621 or EN ISO 12402 marks to backpacks. Dossiers leave within 3 business days when the SKU and market are named.
Name MOQ, colour count, decoration method and ship week. Custom / OEM projects: full proposal within 5 business days. Compliance documentation requests: dossier within 3 business days.